- Overview
- The spraying booth
- The process of automatic line
- The recovery system
- Detailed Photos
Basic Info.
Model NO.
powder coating line
Type
Coating Production Line
Coating
Powder Coating
Substrate
Steel
Certification
CE, ISO
Condition
New
Control
PLC Touch Screen
Oven Insulation Material
150mm Rock Wool
Spray Gun
Gema/Dber
Booth Material
PVC/PP
Usage
More Than 10 Years
Recovery
Cyclone+Filter
Transport Package
Customized
Specification
Design matching
Trademark
ZhYao
Origin
China
HS Code
8424300000
Production Capacity
20 Sets/ Year
Product Description
No. | Process Name | Process Parameter | Mode | Remarks | |
Temperature | Time | ||||
1 | Loading | RT | |||
2 | Pre treatment | 35-50ºC | 15-20 min | Automatic | Adjustable |
3 | Drying Oven | 100-120ºC | 15-20 min | Automatic | Adjustable |
4 | Cooling | RT | 5-10 min | ||
5 | Powder coating | RT | 3-5min | Automatic and Manual | Adjustable |
6 | Curing | 200-220ºC | 30-35 min | Automatic | Adjustable |
7 | Cooling | RT | 10-15 min | ||
8 | Unloading | RT |



Our company and certificates






FAQ
1.Are you a trader or a factory?
We are manufacturer and exporter.
2.What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
3.How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee, reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C,We manning quality inspectors specially to control the processing quality of product strictly.
4.How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.
5.How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.
Feel free to contact with us to get your design .